Document Content ID Nos Date

Building
Assessment of floor slab A1 1 Sep 2006
Specialist Survey A2 1 Sep 2006
Structure Survey A3 27 Jun 2006
Condition Survey Report A4 4 Aug 2006
Building Survey A4 30 Jun 2006

Measured Survey
Measured Survey Introduction B1 20 Jun 2006
Floor Areas Summary B2 20 Jun 2006
Plan/ Elevation B3A 20 Jun 2006
Plan/ Elevation B3B 20 Jun 2006
Plan/ Elevation B3C 20 Jun 2006
Plan/ Elevation B3D 20 Jun 2006
Plan/ Elevation B3E 20 Jun 2006
Plan/ Elevation B3F 20 Jun 2006
Plan/ Elevation B3G 20 Jun 2006
Plan/ Elevation B3H 20 Jun 2006
Plan/ Elevation B3I 20 Jun 2006
Plan/ Elevation B3J 20 Jun 2006
Plan/ Elevation B3K 20 Jun 2006

Site Validation
Adjoining Owners C1 1 Dec 2009
Crime Statistics C2 1 Dec 2009
EA Flood C3 1 Dec 2009
EA Waste C4 1 Dec 2009
EA Pollution C5 1 Dec 2009
CAA Air Space C6 1 Dec 2009
Location C7 1 Dec 2009
EA Air Pollution C8 1 Dec 2009

Environmental
Environmental Analysis D1 26 Jul 2006
Asbestos Survey D2 28 Jun 2006
Environmental Review D3 4 Aug 2006

Environmental (continued)
Soil Analysis D4 15 May 2007
Tank Farm Investigation D5 6 Jun 2007
Environmental - Disinfection Certificate D6 23 Apr 2007
Asbestos Certificate D7 15 Dec 2006
Asbestos Survey D8 12 Oct 2009
Legionellosis Risk Asses D9 5 Nov 2009

Connectivity
Fibre Report E1 23 Jun 2009

Planning
Proposed Application F1 2 Aug 2006
Planning Enquiry F2 22 Aug 2006
Planning Drawings F3 2 Aug 2006
Acoustic Screens F4 17 Aug 2006
Decision F5 6 Oct 2006

Power
Power Survey Report G1 Oct 2006
132KV Installation Plan G2 9 Jan 2006
Power - Agreement for Connection G3 28 Jan 2009
132KV Route G4 12 Apr 2008
Connection Charges G5 5 Nov 2008

Landlords Works
Sprinkler testing H1 16 Apr 2007
Sprinkler Tank Relining Details H2 10 Dec 2007
Lift Commissioning Certificate H3 4 Dec 2007
Unit A Energy performance certificate H4 2 Oct 2009
Unit B Energy performance certificate H5 2 Oct 2009
Unit A Energy performance recommendations H6 2 Oct 2009

Landlords Works (continued)
Unit B Energy performance recommendations H7 2 Oct 2009
Drain Inspection Report H8 20 Aug 2007
Ammonia Removal Report H9 3 Aug 2006
Lightening Protection Certificate H10 1 Nov 2008
Rainwater Pipework Modifications H11 23 May 2007
Unit A SBEM Calculation Document H12 2 Oct 2009
Unit B SBEM Calculation Document H13 2 Oct 2009
Admin Bldg Chubb Commissioning Certificate H14 12 Oct 2009
Admin Bldg Fire Stop Inspection Certificate H15 13 Jun 2008
Admin Bldg Electrical Installation Certificate H16 16 Jun 2008
Final Building Regulations Certificate H17 16 Oct 2009
Fire Risk Assessment H18 8 Jul 2009
Lift Repair H19 5 Oct 2009
Lodge Fire Alarm Certificate H20 21 Dec 2007
Phases 1+2 Chubb Commissioning Certificate H21 24 Sep 2008
Pressure Test Certificates H22 20 Sep 2007
Air Conditioning Certificate H23 10 Jun 2008
Internal Pipework Modifications H24 12 Oct 2009
Power transformer testing H25 22 Nov 2007

Plans
Layout I1 -