Document Content
ID Nos
Date
Building
Assessment of floor slab
A1
1 Sep 2006
Specialist Survey
A2
1 Sep 2006
Structure Survey
A3
27 Jun 2006
Condition Survey Report
A4
4 Aug 2006
Building Survey
A4
30 Jun 2006
Measured Survey
Measured Survey Introduction
B1
20 Jun 2006
Floor Areas Summary
B2
20 Jun 2006
Plan/ Elevation
B3A
20 Jun 2006
Plan/ Elevation
B3B
20 Jun 2006
Plan/ Elevation
B3C
20 Jun 2006
Plan/ Elevation
B3D
20 Jun 2006
Plan/ Elevation
B3E
20 Jun 2006
Plan/ Elevation
B3F
20 Jun 2006
Plan/ Elevation
B3G
20 Jun 2006
Plan/ Elevation
B3H
20 Jun 2006
Plan/ Elevation
B3I
20 Jun 2006
Plan/ Elevation
B3J
20 Jun 2006
Plan/ Elevation
B3K
20 Jun 2006
Site Validation
Adjoining Owners
C1
1 Dec 2009
Crime Statistics
C2
1 Dec 2009
EA Flood
C3
1 Dec 2009
EA Waste
C4
1 Dec 2009
EA Pollution
C5
1 Dec 2009
CAA Air Space
C6
1 Dec 2009
Location
C7
1 Dec 2009
EA Air Pollution
C8
1 Dec 2009
Environmental
Environmental Analysis
D1
26 Jul 2006
Asbestos Survey
D2
28 Jun 2006
Environmental Review
D3
4 Aug 2006
Environmental (continued)
Soil Analysis
D4
15 May 2007
Tank Farm Investigation
D5
6 Jun 2007
Environmental - Disinfection Certificate
D6
23 Apr 2007
Asbestos Certificate
D7
15 Dec 2006
Asbestos Survey
D8
12 Oct 2009
Legionellosis Risk Asses
D9
5 Nov 2009
Connectivity
Fibre Report
E1
23 Jun 2009
Planning
Proposed Application
F1
2 Aug 2006
Planning Enquiry
F2
22 Aug 2006
Planning Drawings
F3
2 Aug 2006
Acoustic Screens
F4
17 Aug 2006
Decision
F5
6 Oct 2006
Power
Power Survey Report
G1
Oct 2006
132KV Installation Plan
G2
9 Jan 2006
Power - Agreement for Connection
G3
28 Jan 2009
132KV Route
G4
12 Apr 2008
Connection Charges
G5
5 Nov 2008
Landlords Works
Sprinkler testing
H1
16 Apr 2007
Sprinkler Tank Relining Details
H2
10 Dec 2007
Lift Commissioning Certificate
H3
4 Dec 2007
Unit A Energy performance certificate
H4
2 Oct 2009
Unit B Energy performance certificate
H5
2 Oct 2009
Unit A Energy performance recommendations
H6
2 Oct 2009
Landlords Works (continued)
Unit B Energy performance recommendations
H7
2 Oct 2009
Drain Inspection Report
H8
20 Aug 2007
Ammonia Removal Report
H9
3 Aug 2006
Lightening Protection Certificate
H10
1 Nov 2008
Rainwater Pipework Modifications
H11
23 May 2007
Unit A SBEM Calculation Document
H12
2 Oct 2009
Unit B SBEM Calculation Document
H13
2 Oct 2009
Admin Bldg Chubb Commissioning Certificate
H14
12 Oct 2009
Admin Bldg Fire Stop Inspection Certificate
H15
13 Jun 2008
Admin Bldg Electrical Installation Certificate
H16
16 Jun 2008
Final Building Regulations Certificate
H17
16 Oct 2009
Fire Risk Assessment
H18
8 Jul 2009
Lift Repair
H19
5 Oct 2009
Lodge Fire Alarm Certificate
H20
21 Dec 2007
Phases 1+2 Chubb Commissioning Certificate
H21
24 Sep 2008
Pressure Test Certificates
H22
20 Sep 2007
Air Conditioning Certificate
H23
10 Jun 2008
Internal Pipework Modifications
H24
12 Oct 2009
Power transformer testing
H25
22 Nov 2007
Plans
Layout